Dullingham Developments, Cheveley, Suffolk.
Chris & Steve of Dullingham Developments got in touch early on into the construction of three new build properties, two of which they were to move into.
They were looking for the most efficient heating solution and had an interest in solar panels, battery storage and Air source heat pump. Pipe&Cable design and specified an “in-roof” solar panels system with battery storage for each property.
We also designed, installed and commissioned three Air source heat pumps,
with Underfloor heating to the ground floor, radiators to the first floor, unvented hot water tanks and undertook all plumbing works throughout including installing their bathroom sanitaryware
Products installed:
Solar
Trina solar panels, GSE integration mounting system, Huawei inverter and batteries.
Heating
Panasonic Aquarea Air source heat pump, Maincor underfloor heating